Hybrid power on real Australian worksite 

b60e2dbb-bf8d-41e4-88eb-3b251124c5a0.png

CASE STUDY FPS20-10 

 YANKALLIA 

FPS20-10 + fast deploy 10kW array & 21kWh Battery

Future Power Systems delivered a reliable hybrid power solution for a remote South Australia Water worksite. The systems power lunchrooms, offices and a toilet block over an 8 month period.​​

96.1% 
renewable power

3,759 kWh
total power consumed 

9,418.58L* 
fuel saved

$20,720.88*
fuel cost savings

.*The figures marked with stars represent estimates or calculations of fuel savings and cost reductions.

CASE STUDY FPS20-10 

SWOOP AREO - MURCHISON TEST FACILITY 

FPS20-10 + fast deploy 10kW array + 14kWh Battery

Swoop Aero’s Murchison Test Facility uses the FPS20-10 with a 10kW solar array and 14kWh battery to power a remote drone testing site, including chargers, communications, office/lunchroom facilities, and water and septic pumps. The site operated 10 hours a day, Monday to Friday over a 2 year period.​​

88% 
renewable power

7,597 kWh
total power consumed 

25,098.7L* 
fuel saved

$55,217.14*
fuel cost savings

.*The figures marked with stars represent estimates or calculations of fuel savings and cost reductions.

4f146975-1cbe-4914-a72e-1fa4394df692.png
IMG_5025 2_edited.jpg

Need help choosing the right system?

Tell us what you need to power, how long the system will run and where the site is located. We will recommend a solution suited to your operational and sustainability requirements.

 

Future Power Systems acknowledges the Traditional Custodians of the lands and waters across Australia and recognises their enduring connection to Country, community, and culture. Based on Yorta Yorta Country, we are committed to working responsibly, learning continuously, and contributing to a future grounded in respect, reconciliation, and care for Country. Learn More.

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2026 Future Power Systems - All Rights Reserved.

bottom of page