top of page
CASE STUDY
Fulham Case Study
Future Power Systems deployed an FPS20-10 hybrid power system to support temporary site facilities in Fulham, Gippsland.
The site presented a useful real-world test case for hybrid power performance, with challenging low-irradiance conditions across the deployment period. Despite this, the system was selected to provide reliable temporary power while helping reduce diesel generator runtime, fuel use and emissions.

Project Name
FPS20-10
bottom of page
